Mast Climbing Platform with Hot Galvanized Treatment

Product Details
Customization: Available
After-sales Service: Spare Parts
Warranty: 12 Months
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2007

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001
  • Mast Climbing Platform with Hot Galvanized Treatment
  • Mast Climbing Platform with Hot Galvanized Treatment
  • Mast Climbing Platform with Hot Galvanized Treatment
  • Mast Climbing Platform with Hot Galvanized Treatment
  • Mast Climbing Platform with Hot Galvanized Treatment
Find Similar Products

Basic Info.

Model NO.
STC100
Operation Form
Air Operation
Maximum Lifting Height
>40m
Maximum Lifting Weight
2000kg
Type
Lifting Platform
Application
Construction Usage
Drive
Pionion and Gear
Power Source
Electric
Transport Package
Standard
Specification
CE/GB/ISO
Trademark
SHENXI
Origin
Wuxi, China
HS Code
8428909090
Production Capacity
500 Sets/Year

Product Description

SHENXI Mast Climbing Work Platform

 
 
Mast Climbing Platform with Hot Galvanized Treatment
 
Single Mast Work PlatformModel: STC100 
Rated load when the platform reaches its max. length: 1000 kg
Max. carrying capacity: 3 persons
Rated lifting speed: 8.3 m/min....
Mast Climbing Platform with Hot Galvanized Treatment Double Mast Work PlatformModel: STC100 
Rated load when the platform reaches its max. length: 1400kg 
Max. carrying capacity: 6 persons 
Rated lifting speed: 8.3 m/min 

Our STC mast climbing work platform is a good solution for work on facades of high and super high rise buildings. It is suitable for facade painting, cleaning, face brick mounting, curtain wall installation, welding of external wall steel structure, and more. The mast climbing work platform is especially great for construction applications where installation of suspended scaffold is impossible or high operating stability and safety is required.

Features of Mast Climbing Work Platform
1. The length and width of our mast climbing work platform are adjustable, so as to suit building's different facade shapes. In addition, some parts of the work platform are telescopic. This enables the platform to be combined into concave-convex shape that fits the building external wall shape, thus better meeting the work requirement.
2. The use of our mast climbing work platform involves no base prefabrication, which greatly facilitates change of work locations.
3. This construction equipment is equipped with many protection devices.
a. The electrical system is designed with creepage, overheat and phase sequence protectors.
b. The work platform uses auto reset upper/lower limit switch and ultimate limit switch without auto reset function, which provide double protection to avoid overtravel at the top and bottom.
c. The overload sensor helps eliminate over-torque operation of the mast climbing work platform.
d. The double mast climbing work platform has an automatic leveling mechanism to automatically adjust the synchronous lifting operation of the two drive devices of the double mast, which can effectively control the work platform tilt. The vertical tilt angle is controlled within 2 degrees.

Mast Climbing Platform with Hot Galvanized Treatment

No. Name
 
Mast Climbing Platform with Hot Galvanized Treatment
 
1 Mast section
2 Drive unit
3 Long balustrade
4 Short balustrade
5 Long platform
6 Short platform
7 Electrical system
8 Base frame
9 Ladder
10 Side frame
12 Mast tie
13 Electrical winch

Technical Parameters:
No. Item Single mast climbing work platform
1 Model STC100
2 Rated load when the platform reaches its max. length 1000 kg
3 Max. carrying capacity 3 persons
4 Rated lifting speed 8.3 m/min
5 Max. operating height 150 m
6 The distance above the last tie-in 4.0 m
7 Max. length of platform 8.8 m
8 Basic platform width 1.5 m
9 Max. platform width after extension 2.5 m
10 The first tie-in from the ground 3~4 m
11 Tie-in spacing About 6m
12 Standard section size 1508×500×500 mm
13 Motor model TYHI100L1-4
14 Motor power 2*2.2kW
 
No. Item Double mast climbing work platform
1 Model STC100
2 Rated load when the platform reaches its max. length 1400kg
3 Max. carrying capacity 6 persons
4 Rated lifting speed 8.3 m/min
5 Max. operating height 150 m
6 The distance above the last tie-in 4.0 m
7 Max. length of platform 23.6 m
8 Basic platform width 1.5 m
9 Max. platform width after extension 2.5 m
10 The first tie-in from the ground 3~4 m
11 Tie-in spacing About 6m
12 Standard section size 1508×500×500 mm
13 Motor model TYHI100L1-4
14 Motor power 4*2.2 kW




Mast Climbing Platform with Hot Galvanized Treatment
International Certification: 

Shenxi Machinery, due to the high quality of our suspended platforms and the commitment of our employees, we have managed to obtain various certificates that can assure customers that they are cooperating with leading manufacturers in the industry. Below, we can see the ISO quality system certificationCE, EAC products' international certification on model ZLP630, ZLP800 suspended scaffoldsSGS, BV, TUV and other third-party international institutions auditing and certification of our company; Customs Authorized Economic Operator (AEO) certification, which helps move your freight delivers priority customs clearance treatment, faster, more efficient shipments, as well as enhanced security.

These certificates can provide excellent performance and most importantly safety for operators and materials.

Mast Climbing Platform with Hot Galvanized Treatment

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier